Skip to main content
Delivery preparation is where a feature you’ve decided to build turns into something a development team can pick up. Each delivery cycle moves through a pipeline of stages. At each stage AI can draft an artifact — a spec, a plan, a task breakdown — from everything the feature’s dossier knows, and the stages you mark as gates wait for your approval before the work goes on. Open it from FeaturesDelivery preparation in the left menu.

See where the work stands

The Kanban tab shows one column per stage and one card per active cycle; List shows the same cycles as a table, in stage order. Each card carries the feature’s name, the cycle number and title, the feature’s summary, and a row of signals from the feature’s dossier: A card showing ⏳ awaiting approval is waiting for you. To move a cycle to another stage, drag its card to that column, or change the stage in its row on List.

Set up your pipeline

Each column is a stage, and the stages are yours to shape to how your team works. A new workspace starts with a pipeline such as Backlog, Specify, Plan, Review, Tasks and Ready for dev. Two markers next to a stage name show how it behaves:
  • — a skill is linked: AI can draft this stage’s artifact.
  • 🔒 — the stage is an approval gate: a cycle waits here until someone approves it.
To change the pipeline, click ⚙ Stages. For each stage you can:
  • rename it, recolor it, and move it up or down
  • link a skill — the instructions AI follows to draft that stage’s artifact
  • tick auto to run the linked skill as soon as a cycle enters the stage
  • tick gate to make the stage wait for approval
  • delete it — its cycles move to the neighboring stage
Add a stage with + Add stage. You can’t delete the last one.

Let AI draft each stage

When a cycle enters a stage with a linked skill and auto on, AI starts drafting that stage’s artifact in the background. It works from the cycle, the feature’s dossier, and the artifacts earlier stages produced — so the plan builds on the spec, and the tasks build on the plan. While it runs, the card shows what it’s doing and for how long. Stages without a gate hand the cycle on to the next stage automatically, so a cycle can run through several stages on its own and stop at the first gate, or at the last stage. Move a cycle by hand while a skill is running, and the run stops. To run a stage’s skill yourself, open the cycle and click ✦ Generate — or ↻ Re-run once there’s an artifact. Each run uses your AI key.

Approve work at a gate

When a cycle reaches a gate and the stage’s work is done, its card shows ⏳ awaiting approval. Open the card, read the artifact, and choose:
  • Approve — the cycle can move on.
  • Override — let it through without approving. Vector asks for a reason and records it.
A cycle can’t be dragged out of a gate until it’s approved or overridden. Every cycle keeps a record of who approved or overrode which gate, and why.

Review a cycle’s work

Click a card to open the cycle. Besides its title, stage and description, you’ll find:
  • Artifacts — one per stage, with every version kept, so you can see how a spec changed between runs.
  • Feature signals — coverage by competitor, public reviews and meeting analysis, each linking into the feature’s page. ↗ Open feature page takes you there.
  • Linked items — the feature, and links to other cycles: relates to, blocks, duplicates, clones or causes. A blocks link is the same dependency the roadmap draws.
  • Run history — every run, with its stage, model and cost.
  • Approvals — who approved or overrode which gate, and why.
At the bottom, Cancel or Archive takes the cycle off the active board and keeps its artifacts. Delete cycle removes it.

Keep track of work that isn’t a feature

Bugs, infrastructure, housekeeping — work that isn’t a feature — go on the Chores tab, so they stay off the delivery board. Type a chore and click Add, tick it when it’s done, or delete it with . Chores don’t move through stages and don’t appear on the roadmap.

Outline larger initiatives

The Delivery tab is a simple outline of larger work: Initiative → Epic → Story → Task. Add an initiative with + Initiative, then add children level by level with + Epic, + Story and + Task. The outline is separate from delivery cycles and from the stages on the board.

Where to go next

Plan a delivery cycle

How a feature gets onto the board.

Roadmap

Scheduling cycles over time.