The board in Delivery preparation tells you what stage each piece of work is in. The roadmap tells you when it ships: a timeline of your delivery cycles, each a bar you can drag to reschedule. Open it on the Roadmap tab of Delivery preparation. Each row is one scheduled cycle, listed by its workspace number and title. A feature with two cycles, v1 and v2, gets two rows, each with its own dates.

Put a cycle on the timeline

A cycle appears on the roadmap only once you schedule it. Click + Add to open Add feature to roadmap: it lists the cycles not scheduled yet. Search by name, and click + Add on a row. The cycle lands on the current week as a two-week bar, ready to move.

Reschedule a cycle

  • Move it: drag the bar along the timeline.
  • Change its length: drag either edge to change the start or the end.
  • Take it off the timeline: hover the bar and click ×. The cycle stays on the board, just unscheduled.
Changes snap to whole weeks when you let go, with a one-week minimum, and save straight away. To see the cycle itself, double-click its bar — it opens on the board. When one cycle can’t start until another is finished, connect them: hover the first bar and drag its handle onto the other. To remove the dependency, click the connector. If a cycle is scheduled to start before the one it depends on ends, the connector and the bar turn red with a . The roadmap flags the conflict but doesn’t move anything for you — you decide which one to reschedule. A dependency that would create a loop is refused. A dependency here is the same blocks link you see in a cycle’s Linked items: add it in either place and it shows in both.

Change the time scale

Switch between Week, Month and Quarter to zoom the timeline in or out; Month is the default. A red line marks today, and the column of cycle names stays pinned while you scroll sideways.

Who can edit the roadmap

Everyone in the workspace can schedule and reschedule cycles, except guests: they see the roadmap read-only and can’t add cycles or drag bars. See Members and roles.